2016年7月21日星期四

PET film coated Mgo roofing tile

1. Introduction to Hot sell mgo wall/roof sheet
The magnesium oxide roofing tiles our company produced, using magnesium oxide, magnesium chloride, talcum powder and other inorganics as raw materials, glass fiber mesh cloth as skeleton. It features fire-proof, heat-insulation, corrosion-resistant, acid& alkali resistant, anti-aging, high strength, shock resistant, long service life, etc.
The MgO roofing tiles could be processed by saw, nails, drilling, Installation is simple and quickly, saving material and labor cost.

(1) Specifications

Wave form                          Big Wave                   Medium Wave                     Small Wave
Length                      1000 mm -7000 mm     1000 mm -7000 mm mm    1000 mm -7000 mm
Width                                  960 mm                   800mm,960 mm                       860 mm
Tickness                          5mm±0.5mm                5mm±0.5mm                       5mm±0.5mm
Wave Height                       55 mm                            40 mm                              35 mm
Wave Number                     4.5                                   7, 7.5                                   5
Wave Distance                 227 mm                        125, 130 mm                         60 mm
Weight/Metre                    9-11 kg                             9-11 kg                              9-11 kg

2. Main Features



1 Water resistance
2 Cold Resistance
3Pressure Resistance
4 Never Fade
5 Easy to be constructed
6 Sound Insulation
7 Heat Insulation
8 Smooth and Clean Glaze
9 Multiple Colors
10 Corrosion Resistance


2. Applications
This product can be widely used for factories, warehouses, garage,shopping centres, residential quarters and villas,feeding-house of all kinds. Especially suitable for corrosive workshop, high-temperature chemical plant, or with other special requirements such as sound insulation and temperature preservation.  It also can be used as the roofing tiles or outer wall of temporary building. 

Installation instructions

(1). As the area of the sheet is big, please don't install in strong wind weather.
(2). To ensure the safty of construction work, temporary sidewalk shall be set up when     working on top of the building roof, and on the ground, safty sign shall be put.
(3). Installation worker shall wear clean, soft rubber shoes, it is strictly prohibited to   stand on the sheet without the support from under purline.
(4). Not any heavy item or hard iterm, such as iron wire, place on the sheet, shall not use the surface of the sheet as operating platform.
(5). When installing, shall drilling the hole by electric drill, and cut by electric serration saw, it is prohibited to use steel nail to dril the hole.

More information, please send email to info@hocre-board.com

没有评论:

发表评论